albertbahn.hu

Railway vehicles: Hungary  ›  Felsőtárkány National Forest Railway  ›  Diesel locomotives

Class C-04 (C-50)

TECHNICAL DATA
Number: 3
Fleet numbers: 403, 404, 406
Manufacturer: MÁV Északi Járműjavító
Type: C-50 GV 5700
Construction years: 1962-1964
Gauge: 760 mm
Axle arrangement: B
Engine: Csepel D 413
Power output: 37 kW
Transmission: mechanic
Tractive effort: 42,5 kN
Maximum speed: 30 km/h
Weight: 7 t
Length: 4600 mm
Width: 1850 mm
Height: 2600 mm
Axle distance: 1500 mm

The C-50 is a widely used locomotive type of the Hungarian narrow-gauge railways. The construcion of the two-axle vehicles started in 1952. More than 250 units were built until 1968. The subtype GV 5700 locos have wheels with external bearings.

Hungary

321 Felsőtárkány Forest Railway

The train approaches Egeresvölgy-Varróház stop from Felsőtárkány.

The train approaches Egeresvölgy-Varróház stop from Felsőtárkány.

The train comes back from Stimecz House terminus, near the Toldi-well spring.

The train comes back from Stimecz House terminus, near the Toldi-well spring.

The train comes back from Stimecz House terminus, near the Toldi-well spring.

The train comes back from Stimecz House terminus, near the Toldi-well spring.

Deep in the woods pulls the small locomotive C-04-404  her three cars.

Deep in the woods pulls the small locomotive C-04-404 her three cars.

The next train is hauled by loco 406. The terminus is not far away.

The next train is hauled by loco 406. The terminus is not far away.

Reversing in four steps 1

Reversing in four steps 1

Reversing in four steps 2

Reversing in four steps 2

Reversing in four steps 3

Reversing in four steps 3

Reversing in four steps 4

Reversing in four steps 4

Thus arrived the first train at the terminus on 20th February.
Photo: Andrea Sóvári

Thus arrived the first train at the terminus on 20th February.
Photo: Andrea Sóvári

Thus arrived the first train at the terminus on 20th February.
Photo: Andrea Sóvári

Thus arrived the first train at the terminus on 20th February.
Photo: Andrea Sóvári

And here approaches the last scheduled train on 13th March (a further relief train was announced for this day).

And here approaches the last scheduled train on 13th March (a further relief train was announced for this day).

Already a huge crowd had been waiting for the train.

Already a huge crowd had been waiting for the train.

On the way to Felsőtárkány

On the way to Felsőtárkány

On the way to Felsőtárkány

On the way to Felsőtárkány

Here lead road and rail side by side.

Here lead road and rail side by side.

On the streets of Felsőtárkány

On the streets of Felsőtárkány

On the streets of Felsőtárkány

On the streets of Felsőtárkány

Arrival at the terminus

Arrival at the terminus

Please, sign in to post a new comment!